Deck Cost Calculator

What a deck costs broken into <strong>decking, framing, railing, footings and labour</strong> — with your own prices.

The Deck

ft
ft
ft
Over about 30in most codes require a railing — that changes the cost

Materials — overwrite with your quotes

$
$
$
Roughly one per 6–8ft of beam. Frost depth drives the cost.
$
$

Results

Enter your details to see results
Total Cost
Deck Area
Cost Per Sq Ft
Decking
Framing
Railing
Footings + Stairs
Materials Subtotal
Labour
Read
How We Calculated

Deck Cost Calculator Guide

Break a deck build into the parts that actually cost money, so you can see where the number comes from and which choices move it.

About the prices

Every price here is a starting point you should overwrite, not a quote. Material and labour costs vary by region, by supplier and by month, and anything published today is stale by next quarter. Put your own quoted numbers in and the arithmetic will be right; leave the defaults and you will get a rough order of magnitude, nothing more.

Material Choice Is Most of the Spread

The same 320 sq ft deck swings enormously on decking alone. Pressure-treated pine, cedar, composite and hardwood can differ by 4–5× per square foot, and that single dropdown moves the total more than anything else on the page.

Composite costs more upfront and skips the staining. Pressure-treated costs least and wants re-sealing every couple of years, so the cheap option has a subscription attached.

The Framing Is Half the Deck and None of the Photos

Joists, beams, ledger, hangers, footings — invisible when it's finished, and roughly as expensive as the surface you walk on. People price a deck by looking at decking boards and are then surprised by the quote.

Footings are the part that varies most by geography. In a cold climate they must go below the frost line, which can mean 4ft holes and a very different number than a warm-climate build with 12in piers.

Railing Is Priced Per Foot and It Adds Up

Railing is quoted per linear foot, not per square foot of deck, so a long thin deck carries more railing than a square one of the same area.

Most codes require a railing once the deck sits more than about 30in above grade. That threshold is worth knowing before you design: a deck at 28in and a deck at 34in are different products at different prices, and the taller one also needs guards that meet a load requirement.

Labour Is Roughly Half — Set It to Zero at Your Own Risk

On a professionally built deck, labour is commonly comparable to materials. Setting labour to $0 gives you the DIY materials number, which is real — but a deck is structural. It's attached to your house, it holds people up, and a badly flashed ledger board is one of the more reliable ways to rot a wall from the inside.

If you build it yourself, the money you save is real and so is the permit inspection. Most jurisdictions require one.

What This Doesn't Include

Permits, demolition of an existing deck, site levelling, electrical, lighting, or a roof. Any of those can be a significant line of their own.

Related: decking calculator for board counts, deck stain calculator, framing calculator.

Need a Calculator We Don't Have Yet?

Can't find the calculator you need? We'll build it. Submit your request and we'll evaluate it for our growing collection.

Request Calculator

Explore Other Categories

🧬Biology ⚗️Chemistry 🔨Construction 📈Digital Marketing 🐾Pets & Animals 🍳Cooking & Food 💰Finance 💪Health & Fitness 🚗Automotive 🧮Math & Everyday 📅Date & Time 🔄Conversions